<p><p><strong>References:<br></strong><em>Berg et al. (2009)<br>Christopher et al. (1990a)<br>Pathak & Alfaro (2005)</em></p><p><strong>Method Summary</strong></p><p>This method involves the inspection and testing of the construction as it takes place to ensure quality of the finished reinforced soil slope. This includes leveling pad, reinforced fill placement, monitoring of compaction, reinforcing elements placement, placement of subsequent facing courses.</p><p><strong>Accuracy and Precision </strong></p><p>The checklist provides general guidelines. However construction manuals for proprietary MSE systems should be obtained from the contractor to provide guidance during construction monitoring and inspection.</p><p><strong>Adequacy of Coverage </strong></p><p>Based on field monitoring system, the construction should meet the expectations which are pre-developed based on specifications.</p><p><strong>Implementation Requirements </strong></p><p>As discussed in cited documents, it is the responsibility for both filed engineer and contractor to monitor the construction and the detailed guideline can be referred to the above mentioned references for the successful construction for RSS constriction.</p><p><strong>General Comments</strong></p><p>Properly construction control and monitoring are important for ensuring the successful construction of RSS structures. However, the detailed steps and analysis is controlled by certain methods requirements and tolerance.</p></p>
Title
Construction Control
Technology