<p><p><strong>References:<br></strong><em>Adams, et al. (2011)<br>Berg, et al. (2009)<br>Morrison, et al. (2006b)<br>Tanyu, et al. (2008)</em></p><p><strong>Method Summary</strong></p><p>This method involves the inspection and testing of the construction as it takes place to ensure quality of the finished reinforced soil slope. This includes reinforced fill placement and compaction and reinforcing elements placement.</p><p><strong> </strong><strong>Accuracy and Precision</strong></p><p>The checklist provides general guidelines. However construction manuals for proprietary MSE systems should be obtained from the contractor to provide guidance during construction monitoring and inspection.</p><p><strong>Adequacy of Coverage</strong></p><p>All aspects of the construction procedure should be actively monitored to ensure results meet expectations.</p><p><strong>Implementation Requirements</strong></p><p>Construction monitoring is the responsibility of both the field engineer and the contractor. The general guidelines provide a basis for successful MSE wall construction.</p><p><strong>General Comments </strong></p><p>Construction control helps to ensure that from project conception to completion all materials and processes have been constantly/randomly inspected and tested to ensure quality of the project as a whole.</p></p>
Title
Construction
Technology