Skip to main content
Submitted by v.schaefer on Wed, 05/30/2018 - 19:13
Summary of Example Specifications

<p><p><h2>Summary of Example Specifications</h2>Only one CSV specification was available at the time of this assessment. This specification should be modified based on project specific parameters.<br><div class="grayed-title subsection"><strong>Specification Name/Number:</strong> Technical Special Provisions for Combined Soil Stabilization with Vertical (CSV) Columns</div><strong>Reference(s):<br></strong><em>Florida DOT</em></p><p>This specification is clearly written and can easily be tailored for a specific project and application. This specification regards CSV columns as a generic soil improvement technique that any contractor with the proper equipment and experience could bid on. The contractor is given the required performance criteria, and is allowed to create the best design. QC/QA testing includes automated monitoring of installation parameters, preproduction test columns, and proof testing of production columns.</p><p>This specification is to be used in conjunction with the latest versions of Florida DOT Standard Specifications, available online at:</p><p><a href="http://www.dot.state.fl.us/specificationsoffice/">http://www.dot.state…;