Skip to main content

Settlement Measurements

Submitted by admin on Wed, 05/30/2018 - 19:21

<p><p><strong>Reference(s):</strong></p><p><em>Dumas and Beaton (1992)</em><em>Elias et al. (2006a)</em><em>Lukas (1986)</em><em>Lukas (1995) </em><em>Mitchell (1981b)</em></p><p><strong>Method Summary<br></strong>Settlement measurements should be performed in a grid pattern over the area being compacted both during and after the compaction program.

Standard Penetration Test

Submitted by admin on Wed, 05/30/2018 - 19:21

<p><p><strong>Reference(s):<br></strong><em>Dumas and Beaton (1992)</em><em>Elias et al. (2006a)</em><em>Han (1998)</em><em>Kumar (2001)</em><em>Lukas (1986)</em><em>Lukas (1995) </em><em>Mackiewicz and Camp (2007)</em><em>Mitchell (1981b)</em><em>Schaefer et al.

Vibration Monitoring

Submitted by admin on Wed, 05/30/2018 - 19:21

<p><p><strong>Reference(s):</strong></p><p><em>Dumas and Beaton (1992)</em><em>Elias et al. (2006a)</em><em>Lukas (1986)</em><em>Lukas (1995)</em></p><p><strong>Method Summary<br></strong>Vibration monitoring should be performed at any nearby structures or facilities that could be damaged. These include buildings and other engineered structures such as dams, retaining walls, buried conduits, etc.